HMY Yachts
1 / 20

2022 Sportsman 352 "Change Order"

$269,000

Located in West Palm Beach, FL


Key specifications

Year
2022
Length
35 ft
Model
352
Fuel
Gas/Petrol
Power
Port: Yamaha XF425NSA2 (425.00 HP / 316.92 kW) / Starboard: Yamaha XF425NSA2 (425.00 HP / 316.92 kW)
Hull
Fiberglass

About this 2022 Sportsman 352 "Change Order"

This 2022 Sportsman 352, "Change Order," is a top-tier offshore center console loaded with premium features and powered by twin Yamaha 425 outboards with digital electric steering and low hours under 300, backed by an extended engine warranty. Built for serious performance and all-day comfort, she blends innovative technology, high-end finishes, and genuine fishability.

At the helm, dual Garmin GPSMAP 8622 22" displays, a Yamaha Command Link Plus CL7 touchscreen, and SeaStar Maximus digital…

Measurements
Display length
35 ft
Length overall
35 ft 2 in
Beam
11 ft 2 in
Maximum draft
2 ft
Power
Port: Yamaha XF425NSA2 (425.00 HP / 316.92 kW) / Starboard: Yamaha XF425NSA2 (425.00 HP / 316.92 kW)
Fuel capacity
330 gal
Seakeeper
No
Engine hours
250.00 hrs / 250.00 hrs
Cruise
37.8 MPH
Heads
1

HMY Yachts is pleased to assist you in the purchase of this vessel. This boat is centrally listed by DH Yacht Sales. It is offered as a convenience by this broker/dealer to its clients and is not intended to convey direct representation of a particular vessel.

Frequently asked questions

Is the 2022 Sportsman 352 "Change Order" still for sale?

Yes — the 2022 Sportsman 352 "Change Order" is currently for sale in West Palm Beach, FL, offered at $269,000.

How much does the 2022 Sportsman 352 "Change Order" cost?

The 2022 Sportsman 352 "Change Order" is offered at $269,000. She is powered by Port: Yamaha XF425NSA2 (425.00 HP / 316.92 kW) / Starboard: Yamaha XF425NSA2 (425.00 HP / 316.92 kW) showing 250.00 hrs / 250.00 hrs, with 1 heads below.

Where is the 2022 Sportsman 352 "Change Order" located?

The 2022 Sportsman 352 "Change Order" is located in West Palm Beach, FL and is available to view by appointment.

Send inquiry